Workshop & Field Records

The Build Log and Trial Telemetry

Chronological notes straight from the workbench, tracking steam manifold builds, sensor calibrations, and twenty-crate verification runs.

Previous Notes

Engineering the Chamber

Past build entries documenting the iterative process of getting chamber dynamics right.

Steam Boiler Selection

RTD Probe Calibration

Internal Baffle Design

Choosing a reliable generator capable of delivering consistent low-pressure steam without pressure spikes during cycle ramps.

Rigorous multi-point testing of temperature sensors to ensure absolute accuracy at core pulp thresholds.

Solving condensation drip marks on lower tray layers by installing sloped internal stainless deflectors.

Follow Every Build Milestone

Get direct notifications when new trial reports, CAD updates, and temperature telemetry graphs are published.